Marina Bay Financial Centre (MBFC) is being developed by a joint venture comprising three of Asia's most experienced and trusted property developers - Cheung Kong (Holdings) Ltd/Hutchison Whampoa, Hongkong Land and Keppel Land, and managed by Raffles Quay Asset Management (RQAM).

MBFC sits on a prime 3.55 hectare waterfront site at the heart of Singapore's new downtown. The tenant-centric design of this purpose-built financial centre combines the best in form and function, making it a key draw for businesses and befitting Singapore's position as a global financial hub.

MBFC offers a breathtaking blend of three distinguished office towers with nearly 3 million sq ft of Grade A office space, two residential towers comprising 649 luxury apartments and penthouses as well as approximately 176,000 sq ft of retail space to meet the daily convenience of our business community and residents.

MBFC achieved the Green Mark Gold for its office towers 1 & 2, Marina Bay Residences and Marina Bay Suites and the Green Mark Gold Plus for its office tower 3 conferred by the Building and Construction Authority of Singapore. This award recognises the efforts made by the developers to encourage sustainable design practices, and makes MBFC one of the few developments to win more than one BCA Green Mark award.

 

 

13-Apr-2010

JV Consortium's Foresight in Developing Marina Bay Financial Centre Comes to Fruition Office Tower two Tops out with Phase One near Completion (in PDF)

07-Apr-2010

Marina Bay Financial Centre Phase One Fully Leased Ahead of Completion (in PDF)

25-Jan-2010

Nomura Moving to Marina Bay Financial Centre (in PDF)

25-Jan-2010

Marina Bay Financial Centre in Singapore Signs Nomura as Tenant: Phase One Now 79% Pre-committed (in PDF)

04-Nov-2009

An Additional 89,000 Square Feet at Marina Bay Financial Centre Tower Two Taken Up (in PDF)

27-Oct-2009

'Shop, Dine and Play' At Marina Bay Link Mall (in PDF)

27-Aug-2009

Marina Bay Financial Centre Signs Up Global Serviced Office Operator as New Tenant (in PDF)

29-Jul-2009

Marina Bay Financial Centre Marks Milestone With Tower One Topping Out Ceremony (in PDF)

27-May-2009

Marina Bay Financial Centre and One Raffles Quay Conferred Prestigious Environmental Awards (in PDF)

21-Oct-2008

Marina Bay Financial Centre bestowed National Arts Award (in PDF)

10-Sep-2008

Marina Bay Financial Centre Secures Leases from BHP Billiton, Macquarie and Murex (in PDF)

21-May-2008

Marina Bay Financial Centre and One Raffles Quay win awards for safety and sustainability (in PDF)

21-May-2008

Marina Bay Financial Centre Announces New General Manager - Wilson Kwong (in PDF)

12-Dec-2007

DBS Bank to lease 700,000 square feet in Marina Bay Financial Centre (in PDF)

09-Aug-2007

First Office Tower of Marina Bay Financial Centre Fully Leased, New Residential Tower Launching Soon (in PDF)

03-May-2007

Marina Bay Financial Centre Developer Awards Main Contracts for Phase 1 (in PDF)

18-Apr-2007

Standard Chartered to move to Marina Bay Financial Centre (in PDF)

16-Feb-2007

Marina Bay Financial Centre Consortium Exercises Phase 2 Option (in PDF)

11-Dec-2006

Much Awaited Marina Bay Residences Launched for Sale (in PDF)

09-Nov-2006

Marina Bay Residences to Put Singapore on World Map for Iconic Waterfront Living (in PDF)

05-Oct-2006

New $2 Billion Marina Bay Financial Centre in Singapore Will Double City's Premium Office Space (in PDF)

02-Aug-2006

Exclusive Marina Bay residential development set for Q4 launch - setting a new standard in urban living in Asia (in PDF)

 

 

Tower 1

Overall Size

Approx. 57,600 sq. m NLA (Office Floors)
 

Completion Date  

2010
 

No. of Office Floor

29 floors (3rd to 29th , 31st to 32nd )
 

Typical Floor Area

Approx. 1,950 sq. m NLA
 

Core to Window Depth

Approx. 15.2m (N) / 13.4m (E) / 11.5m (S) / 13.4m (W)

 

Finished Floor-to-Ceiling Height

2,750mm

 

Raised Floor

Approx. 180mm from top of slab to top of raised floor
 

Planning Grid

1,500mm
 

Floor Loading

Office Floors: Live Load = 3.5 KN/sq. m ; Partitions = 1.0 KN/sq. m
 

Curtain Wall

Unitised aluminium system with double glazed low E-solar tinted or single thermal toughened glass
 

Total no. of Car Parking Spaces

Approx. 438 lots in both towers for tenant's use and approx. 248 lots at Central Park for the public

Toilets

Male and Female, 1 Executive Toilet with shower combined with a Handicapped Toilet per floor

Pantry

Provision for tenant's pantry exhaust connection to central pantry exhaust riser on every floor

Waste water discharge from Pantry to nearest waste stack by tenants. Alternatively, a floor standing waste water pumping unit is available in the market for connection by tenants subject to approval of waiver from PUB for use of unit.
 

Air-conditioning

 

 

 

 

24-hour chilled water supply from District Cooling System with an AHU per floor.

Estimated cooling load for a typical office floor is 240 kWr per floor.

One DCS chilled water tap-off points have been provided for each floor in conjunction with one supplementary chilled water tap off point which is backup by air-cooled chillers with emergency power supply for 20% of estimated cooling load

Two sets of chilled water riser pipes have been provided for each floor, subject to availability.

Space available for 3 nos tenants' own air-cooled chillers system, subject to availability

Security System

24-hour CCTV monitoring at all main entrances and exits
Card Access Control via turnstiles to lift lobbies.
 

Fire Protection

Addressable fire alarm system
Automatic sprinkler network, wet riser system, hosereels and portable fire extinguishers
 

Lighting

Average 500 lux at desktop level.
 

Incoming Electrical Supply & Electrical Loads

Dual feed for 22 kV incoming power supply
Lighting: 15 W/sq. m
Power: 70 W/sq. m
 

Computer Earthing

Provision of clean earthing available in each tenant data riser, subject to availability.
 

Standby Generator

20% of estimated tenant normal load.
 

Spare Riser

 

For tenants' inter-floor cabling and specialised services
Total 6 nos risers (3 electrical risers & 3 data risers), subject to availability.
 

Space Reserved for Tenant's Own Generator

6 no. of generator spare plinths reserved for tenants' use, subject to availability
Provision of fuel pipe for connection to tenant's generator system.
 

Telecommunication

Fibre Optic and telephone cabling in riser (by Service Provider) and MATV.
 

Lift Types
 

Zone

Number

Load Capacity

Speed

Passenger Lifts

Low rise:
1st, 3rd to 17th Storey
 

8

1,900kg
(28 person)
 

5m/sec

Passenger Lifts

High rise:
1st , 18th to 33rd Storey
 

8

1,900kg
(28 person)
 

6m/sec

Service Lifts

All floors

2

2,450kg
 

3.5m/sec

Carpark Lifts

B2, B1 and 1st Storey

2

900kg
(13 person)
 

1.5m/sec

 

 

Floor plans are available on http://www.mbfc.com.sg.

 

 